천연가스설비용량 690.5 MW
State Line Combined Cycle
- 2299 S State Line Ave, Joplin, Jasper, 미주리, 64804
- 연료원
- 천연가스 (Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine;)
- 설비용량 690.5 MW · 여름 최대 624 MW
- Empire District Electric Co
- Electric Utility
- EIA 보고 기준: 202502