천연가스설비용량 1,197.3 MW
Intercession City
- 6525 Osceola-Polk Line Road, Intercession City, Osceola, 플로리다, 33848
- 연료원
- 천연가스 (Natural Gas Fired Combustion Turbine; Petroleum Liquids;)
- 설비용량 1,197.3 MW · 여름 최대 940 MW
- Duke Energy Florida, LLC
- Electric Utility
- EIA 보고 기준: 202502