천연가스설비용량 2,680.9 MW
Fort Myers
- 10650 State Rd 80, Ft. Myers, Lee, 플로리다, 33902
- 연료원
- 천연가스 (Natural Gas Fired Combined Cycle; Natural Gas Fired Combustion Turbine; Petroleum Liquids)
- 설비용량 2,680.9 MW · 여름 최대 2,735.5 MW
- Florida Power & Light Co
- Electric Utility
- EIA 보고 기준: 202502